Jackson Road Bridge Replacement Project

Take the Jackson Road Bridge Replacement Survey

This project will replace the Jackson Road bridge in Birch Bay. 

Bridge Location:

Public Participation

We want your help and input as we design what the next bridge will look like. Information gathered from the public will help us develop alternative bridge designs as we move forward. Public participation will come from virtual open house-style events and an online survey. 

Virtual Open Houses

Two virtual open houses are planned to provide opportunities for public input on bridge features, size, aesthetics, traffic modifications, and temporary construction impacts. 

  • The first open house was held on Feb. 3, 2021. A summary of the meeting will be posted on this website soon. 
  • The second open house will take place in summer 2021. No date has been set yet for this meeting. Sign Up for Project Updates to be notified when meeting information becomes available. 

Online Survey

Status and Timeline

The project is entering Phase 1 which includes:

  •  Topographic Survey/Site Reconnaissance
  •  Preliminary Engineering
  •  Community Engagement
  •  Type, Size, & Location Analysis

Anticipated Project Timeline

  • Phase 1 - Topographic Survey, Preliminary Engineering, and Type, Size, & Location Analysis (Current Phase). 
  • Phase 2 - Detailed Design & Permitting (2021-2022).
  • Phase 3 - Construction (TBD).
  1. Tonight: Jackson Road Bridge Replacement Virtual Public Meeting

    Remember that the Jackson Road bridge replacement project public meeting starts at 6pm tonight, Wednesday, Feb. 3. View the Zoom link and log in information. Read on...
  2. Bridge Replacement FAQ's Available on Project Website

    The Jackson Road bridge replacement project webpage now has a frequently asked questions section, online survey available for the public to comment. Read on...
  3. Public Survey Now Available for Jackson Road Bridge Replacement Project

    Public Works invites anyone who uses the Jackson Road bridge in Birch Bay to take an online survey to help us design a replacement bridge: https://www.surveymonkey.com/r/QZWBBNM
View All

Sign Up for Project Updates

Using the Notify Me system, you can sign up to get notifications by text or email whenever we have project updates to share.

How to sign up to receive email and/or text notifications: 

  1. Go to the Notify Me section of our website. 
  2. Type in your email address and phone number under the Your Profile Information section at the top of the page.
  3. Scroll down to News Flash, find the News Flash item labeled Public Works – Jackson Road Bridge Replacement Project.
  4. Click on either the envelope icon and/or the phone icon, depending on your preferences. The envelope icon will send you emails, and the phone icon will send you text messages. 
  5. Finally, you will get an email or text message from Civic Plus (depending on which icon you clicked on in Step 4 asking you to confirm your subscription. Click on the link in this email to confirm your subscription.

Trouble signing up? Email Marie for assistance.