Back to Whatcom County home page Whatcom County | Departments | Contacts |  Help |  Search
 Planning and Development Servicesheader image
  PDS Home  | Building  | Code  | Fire  | GIS  | Natural Resources  | Permits  | Planning  | Calendar

   
Building Services

Building Home
Residential Home

Accessory Dwellings
Decks
Garages
Moved Buildings
Townhouses
Required Forms
Required Plans
Submittal Process

Our Services

Building Services
Code Enforcement
Fire Marshal
GIS Maps & Data
Natural Resources
Permit Center
Planning
SEPA
Contact Us

Quick Links
Applications / Forms
Calendar
Reports

Director:
J.E. “Sam” Ryan, CBO

5280 Northwest Drive
Bellingham, Washington 98226
Telephone: (360) 676-6907
E-mail: pds@co.whatcom.wa.us

 
Residential / Moved Buildings

moved house

All structures that are moved from one site to another require a pre-move inspection performed by a Whatcom County Building Inspector or a WA State licensed Engineer. The pre-move inspection form may only be obtained from the Planning & Development office located at 5280 Northwest Drive.

Once the pre-move inspection has been completed and the building has been approved to be moved, you may apply for a building permit to move your structure. A building permit is required to construct a new foundation under an existing or moved building.

You will follow the same submittal process as for a regular buildng permit with the following changes:

  1. Elevation drawings showing all 4 sides of the building (labeled North, East, South, & West). Plans should be 1/4" = 1'0" scale. Elevation views are needed to show the shape of the building, height, number of stories, and any covered porches or decks.
  2. Provide an as-built roof framing plan that shows how roof loads are/will be transferred to the foundation (i.e. full span trusses or stick framed roof that relies on interior walls for support).
  3. Provide a foundation/as-built floor framing plan. Show perimeter foundation and interior pad or strip footings. Show size and location of access and vents.
  4. Provide foundation details for perimeter foundations and all pad footings. Indicate dimensions, reinforcement, mudsills, anchor bolts, post to beam and footing connections. Show floor insulation and vapor barrier. Indicate how the existing floor framing will be positively connected the the new foundation at mudsills.
  5. The WA State Energy Code requires installation of R-30 insulation in the floor and 6 mil black plastic vapor barrier in the crawl space.
  6. Smoke detectors must be installed in accordance with IRC 313.1 as well as carbon monoxide detectors in the existing buildings.
  7. Depending upon the complexity of the project, additional information may be required.
  8. Fees for a pre-move inspection are $200 base fee up to 1 hour then $100 per hour for each additional hour. (UFS#8374)